7/14/2023 0 Comments Newton county water and sewage![]() Environmental Protection Agency and the state of Georgia. ![]() The program is jointly funded by the U.S. These projects conserve and improve water resources and facilitate economic development. The CWSRF provides low-interest loans for wastewater and water pollution control infrastructure. The city is eligible for principal forgiveness up to $430,470. The city will pay 0.13% interest on the 20-year loan, which qualifies for a reduced interest rate because the city is a WaterFirst Community. The project will ensure permitting compliance, maintain operator safety, and improve treatment effectiveness. As environmental factors are rapidly evolving, the Stormwater Division must continue to be proactive in preparing to face increased demands, mandated requirements, and changes to the way we view stormwater.The city of Mansfield was awarded a Clean Water State Revolving Fund (CWSRF) loan in the amount of $956,600 to finance rehabilitating the water pollution control plant. The City of Newton prides itself on having one of the most proactive stormwater management plans in the Commonwealth and our goal is to continue being a leader. Finding a way to mitigate this stormwater runoff is paramount to the long-term sustainability of local waters including the Charles River and is required by federal law. As rain falls upon streets, sidewalks, homes, or other man-made structures, the water becomes polluted as it naturally enters back into ponds, rivers, or other sources. The goals of the Stormwater Division are to protect the environment and prevent flooding by reducing and improving quality of stormwater runoff into the Charles River watershed. The city aims to reduce I/I contributions, while reducing sewer flow that may be exfiltrating to the underdrain system and contributing to the contamination of local waterways. The objective of the CIP is to identify and rehabilitate infrastructure defects, including underdrain connections, which contribute infiltration and inflow (I/I) to the sanitary sewer system. A list of CIP projects arranged by priority can be found here, and a City map of projects can be found here. Prioritization was based on flow monitoring results, underdrain locations, pipe material and age, and operation and maintenance problem areas. The program was developed by evaluating city-wide collection system data and prioritizing the areas for evaluation and rehabilitation. Through annual inflow and infiltration improvements, the Sewer Division improves the flow of wastewater, reduces MWRA rate increases, and prevents harm to the environment.Ĭurrently, the City of Newton is in the seventh phase of an 11-year Sewer Capital Improvement Program (CIP) intended to update the City’s wastewater collection system. To achieve this goal, the Sewer Division ensures that the infrastructure is properly maintained and replaced. The sewer system transports wastewater out of the city and into Massachusetts Water Resource Authority (MWRA) treatment plants. The goal of the Sewer Division is to provide a safe and efficient sewer system throughout the City of Newton. By integrating all three sets of criteria, the infrastructure improvement decision making process and overall capital efficiency are optimized. The criteria used in the evaluation consisted of System Hydraulics, Critical Component Assessment, and Asset Management Considerations. The purpose of the CEP was to identify areas of the water distribution system in need of rehabilitation, repair, or replacement and to prioritize improvements to make the most efficient use of the City’s capital budget. In August 2021, the City completed a Capital Efficiency Plan (CEP) for the Newton Water system. If you have questions regarding an estimated water bill, please visit our page on estimated water bills. ![]() To accomplish this, the Department ensures that all water lines have been properly maintained and replaced when necessary, all leaks are found and dealt with quickly, and most importantly, no harmful chemicals such as lead are able to infiltrate the water system. The water is clean and safe and is delivered efficiently. The goal of the Water Division is to provide top tier water delivery to city residents, institutions, and commercial properties. The Utilities Division is responsible for the City's water, sewer, and drainage infrastructure. Newton Highlands Village Enhancement Project.Public Works Project and Construction Information +.Sustainable Materials Management Commission.Recycle at the Resource Recovery Center.Sustainable Materials Management (Recycling and Trash) +.Updating and Repairing Water & Sewer Services.
0 Comments
Leave a Reply. |